Modular vs Stick-Built: Cost and Time Compared

By the Home Building Cost Calculator team · Updated November 2026

A modular home usually costs 10% to 20% less than a stick-built house and is often finished in 3 to 6 months instead of the 7.6-month average for site-built homes. In 2026 modular homes cost about $80 to $160 per sq ft installed, compared with a US median of about $166 per sq ft for stick-built.

Modular vs stick-built: side by side

ModularStick-built
Cost per sq ft$80–$160 installed$143.50–$215.50 by state, $166 median
2,000 sq ft home$160,000–$320,000about $332,000 at the median
Build time3–6 months7.6 months start to completion (2024 average)
Where it is builtfactory sections, set by craneon site
Building codestate and local codesstate and local codes
Financingconstruction loan, then mortgageconstruction loan, then mortgage

Where modular saves money

  • Labor efficiency: factory crews work indoors without weather delays.
  • Material buying: factories buy in bulk and waste less.
  • Time: the modules are built while the foundation is poured, which shortens the loan period and the time you pay rent.

Where stick-built can win

  • Design freedom: module sizes are limited by what can travel on a road, which constrains room widths and complex shapes.
  • Difficult sites: steep or narrow lots can make crane access and delivery expensive ($3,000 to $8,000 delivery and $10,000 to $35,000 for the set).
  • Local builder availability: in some areas there are few modular dealers, which reduces competition.

Which should you choose?

Choose modular if you want a standard plan, a predictable price and a faster build on an accessible lot. Choose stick-built for a highly custom design or a difficult site. Price both with the calculator above using your state.

Compare other house types

Sources